Volume 31 (2020)
Volume 30 (2019)
Volume 29 (2018)
Volume 28 (2017)
Volume 27 (2016)
Volume 26 (2015)
Volume 25 (2014)
Volume 24 (2013)
Volume 23 (2012)
Volume 22 (2011)
Volume 21 (2010)
Volume 20 (2009)
Volume 19 (2008)
Volume 18 (2007)
Volume 17 (2006)
Volume 16 (2005)
Volume 15 (2004)
Volume 14 (2003)
Volume 13 (2002)
Volume 12 (2001)
Volume 11 (2000)
Volume 10 (1999)
Volume 9 (1998)
Volume 8 (1997)
Volume 7 (1996)
Volume 6 (1995)
Volume 5 (1994)
Volume 4 (1993)
Volume 3 (1992)
Volume 2 (1991)
Volume 1 (1990)
Volume 1 (1989)
1. Constrained Supply Chain Scheduling Model Using Sequential Quadratic Programming Algorithm

Derick Erl Sumalapao; Leon Elijah C. Bagwan; Angelyn R. Lao

Articles in Press, Accepted Manuscript, Available Online from 04 July 2020

http://dx.doi.org/10.22059/jsciences.2020.277010.1007380

Abstract
  Challenges such as advances in technology, demands of global market, and limited warehouse spaces resort manufacturing industries to subcontracting. Subcontracting has been a considerable alternative in the manufacturing industries and is utilized as a strategic tool to diminish operation costs primarily ...  Read More